Do I need a permit to demolish a building?
Yes, to demolish all or part of a building or structure larger than 10 m². The application needs the Demolition Permit Clearance Form with all required signatures, the Application for a Permit to Construct or Demolish and a site plan showing every structure to be removed. If the site has a fuel tank, you must notify the Fuel Safety Branch in writing and include a copy. The 2026 fee is a flat $264.20.
Most farm buildings are exempt unless another law such as the Ontario Heritage Act applies. During demolition, dust must be controlled by wetting materials and the Noise By-law's hours apply.
Source: Town of Milton, Demolition Permits
When does a tent need a building permit?
When a single tent is more than 60 m² in ground area; when two or more tents less than 3 m apart exceed 60 m² combined; when the tent is attached to a building; or when it is less than 3 m from another structure. The application includes a certificate of flame resistance, engineer's drawings of the tent and its anchoring, a site plan and a floor plan. A professional engineer's review is required for tents over 225 m², with bleachers or enclosed with sidewalls.
Source: Town of Milton, Tent Permits
What is a Certificate of Occupancy?
A zoning approval, separate from a building permit. It confirms that a proposed use of land or a building complies with the Town's zoning before the space is occupied. Most non-residential uses and some residential ones need it, including a bed and breakfast, a home occupation, shared housing and a short-term rental. Apply with a site plan, a floor plan and a letter describing the business; the Town gives the current fee as $157.
The Town recommends confirming that your use is permitted under the zoning by-law before you buy or sign a lease.
Source: Town of Milton, Certificate of Occupancy
My subdivision is new. Is there an extra step?
Possibly. If your subdivision has not yet been assumed by the Town, you must obtain a developer's clearance letter from the builder before a permit for work such as a deck can be issued. To find out whether your subdivision has been assumed, call 905-878-7252 ext. 2398.
Source: Town of Milton, Decks
What if the property is a heritage property?
It depends on its status under the Ontario Heritage Act. A listed property does not need a heritage permit for alterations or additions. A designated property does: the owner must apply for a heritage permit for changes such as additions, replacing windows or doors, changing roofing or cladding, or installing or removing decks, fences and porches. To demolish a listed property, the owner must give Council 60 days' notice.
Routine maintenance, re-roofing in similar materials and colour, repointing brick and repairing chimneys generally do not need a heritage permit.
Source: Town of Milton, Alter a Heritage Property
Are there other charges when a permit is issued?
For new buildings and work that adds homes or non-residential floor area, yes: development charges for the Town, Halton Region and the school boards. The Town's Building Permits page lists residential and non-residential development charge forms among the additional forms an application may need, along with forms for payment in lieu of land conveyance.
Until Dec. 18, 2027 the Town refunds building permit fees on qualifying rental and affordable housing, to a maximum of $2,500 a unit; the program does not apply to additional residential units.
Source: Town of Milton, Development Charges