Do I need a permit? Decks, basements, sheds in Milton
A homeowner's list: which projects need a Town permit, what each one costs in 2026, and the zoning rule most likely to catch you.
Summary
In Milton you need a building permit to finish any part of a basement, to cut a new window or door opening, and to build a deck that is attached to the house or is freestanding and larger than 10 m². Pools and hot tubs need a pool enclosure permit, and changing a driveway entrance needs a curb cut permit. Apply through the Town's online permit portal; questions go to Building Services at 905-878-7252 ext. 2397.
Administered by the Town of Milton's Building Services and Zoning staff; driveway entrances are permitted by Licensing and Permits. Every answer below was checked against its source on November 18, 2026; the source is linked under each one.
Decks, sheds and the yard
Do I need a permit to build a deck in Milton?
Yes if the deck is attached to a building or structure, or is a freestanding deck greater than 10 m² in area. Apply through the online portal with a site plan, a deck structural or floor layout, and a deck section with details; the Town publishes sample drawings. The 2026 fee for a new unenclosed deck or porch, or an alteration to an existing deck, is a flat $163.11. Typical inspections are footing, framing and final.
Replacing or enlarging an existing deck is covered too. A Schedule 1 designer form is needed when someone other than an architect or engineer prepares the design.
Where can a deck go, and how close to the lot line?
In the low and medium density residential zones of the urban zoning by-law, a deck up to 1.2 m above grade is allowed in an interior side, exterior side or rear yard, at least 0.6 m from the side lot lines and 3.0 m from the rear lot line. A deck more than 1.2 m above grade is allowed in the rear yard only, no closer to the side lot lines than the house, 3.0 m from the rear lot line, and projecting no more than 4.0 m from the rear wall of the house.
Deck up to 1.2 m high: side lot lines
0.6 m
Deck up to 1.2 m high: rear lot line
3.0 m
Deck over 1.2 m high: location
Rear yard only
Deck over 1.2 m high: projection from the house
No more than 4.0 m
Privacy fencing on a deck
Up to 1.5 m above the platform, on up to 60% of the perimeter
For a semi-detached or townhouse dwelling the interior side setback for a low deck is 0.0 m. A deck platform may never be higher than the floor of the first storey, and no deck may sit on, under or over an easement in favour of the Town.
The Town's fee list has a building permit class for a shed, detached garage, gazebo or personal workshop: a flat $163.11 up to 27.9 m², and $9.44 per square metre above that. The Town's pages do not state a size below which a shed needs no permit, so confirm with Building Services before you buy one. Whatever the answer, the zoning by-law's limits on where a shed can sit and how big it can be still apply.
Demolishing a detached structure larger than 10 m² needs a demolition permit.
Yes. A pool permit is required to install a swimming pool or hot tub in Milton. It is a permit for the enclosure: the Swimming Pool Fencing By-law requires pools to be enclosed by a compliant fence with controlled access points. The 2026 fee is a flat $222, and approvals typically expire six months after the permit is issued.
You need a curb cut and entrance permit before modifying a driveway entrance or building a new one within the Town's road allowance. Entrance construction is permitted between April 1 and Oct. 31, the driveway must stay at least 1.2 m clear of hydrants, street trees and streetlights, and the width must comply with the zoning by-law. Allow at least 10 business days for initial review and up to 30 business days for the permit.
Lots in subdivisions registered after the year 2000 have a warning clause on title prohibiting these modifications, with no exception or appeal. The Town does not issue permits for entrances on Regional roads, and applicants need a certificate of insurance with at least $5 million in commercial general liability.
Only a large or attached one. A building permit is required where a single tent exceeds 60 m² in ground area, where two or more tents less than 3 m apart exceed 60 m² combined, where the tent is attached to a building, or where it is less than 3 m from another structure. The 2026 fee for a temporary tent is a flat $264.20.
Yes. A building permit is required in Milton before finishing any portion of a basement, and for renovating an existing finished basement. Submit an existing floor plan showing walls, windows, plumbing and HVAC, and a proposed layout showing the extent of the work. The 2026 fee is $6.55 per square metre with a minimum of $264.20, and more may apply for new plumbing fixtures, fireplaces, windows or doors.
Adding a bedroom or a new exterior window or door opening means an overall site plan is required too. Typical inspections include framing, insulation and air barrier, plumbing, heating and a final building inspection.
Not unless it is approved as a separate unit. The Town says cooking facilities are not permitted in a finished basement unless the space is approved as a secondary dwelling unit, and asks anyone planning a kitchen to review its basement apartment guidelines before applying.
Do I need a permit for a new window, door or side entrance?
Yes. A building permit is required for new exterior openings, including windows, doors, egress windows and below-grade entrances. The application needs a site plan showing the openings, window wells and distances from property lines, a floor plan, details of the window and door types, and a wall section showing lintel sizes, flashing and drainage. The 2026 fee for a new opening or side door entrance is a flat $264.20, the same as for a basement walkout or exterior stairs.
Exterior stairs to a new door must meet the zoning setbacks from front, rear and side lot lines.
The Town's residential fee list includes each of them as permit work. An interior alteration is $6.55 per square metre with a $264.20 minimum; new plumbing or a plumbing alteration, and a fireplace or woodstove, are a flat $264.20 each; and an addition to a house is $25.13 per square metre with a $264.20 minimum.
Yes. If your subdivision has not yet been assumed by the Town, you must obtain a developer's clearance letter from the builder before a permit for a deck, a new exterior opening or a pool can be issued. Call 905-878-7252 ext. 2398 to find out whether your subdivision has been assumed.
If it is designated under the Ontario Heritage Act, you need a heritage permit for work such as adding to the building or an accessory structure, replacing or changing windows or doors, changing trim, roofing or cladding, painting the exterior, or removing or installing decks, fences, porches and chimneys. A property that is only listed on the heritage register does not need a heritage permit for alterations or additions.
Routine maintenance and minor repairs that do not change the exterior, re-roofing with similar materials and colour, repointing brick and repairing chimneys generally do not need one.
What if my project does not meet the zoning by-law?
You can apply to the Committee of Adjustment and Consent for a minor variance. The Town's Type 1 category, with a Town fee of $2,467, covers decks, fences, accessory structures, parking on residential driveways and residential additions of less than 75 m². New dwellings and additions of more than 75 m² are Type 2, at $4,638. A draft application goes to the Committee's Secretary-Treasurer for preliminary review first.
Fees are non-refundable if the application is withdrawn, and decisions can be appealed within 20 days.
Yes, if it is larger than 10 m²: a demolition permit is required to demolish all or part of a building or structure of that size, including a detached structure. The application needs the Demolition Permit Clearance Form with all required signatures and a site plan, and the 2026 fee is a flat $264.20.
The Town warns that building without a permit can result in fines and penalties under the Building Code Act. Its fee list also includes an order to comply at $338.86 and a stop work order at $676.57, which the Town's fees by-law adds to the permit fee when work is carried out before a permit is issued.