How do I get a pool permit in Milton?
No one may excavate for, erect or install a pool and its enclosure without a permit from the Chief Building Official. Apply through the Town's online permit portal with the Swimming Pool Permit Application and a site plan showing property lines and buildings, the pool and equipment with their setbacks, the enclosure's fence type, height, gates and access points from all buildings, and any easements, catch basins, retaining walls, swales, patios and decks.
A pool deck or a pool equipment shed may need a separate building permit, and work that changes the grade or adds a retaining wall may also need a site alteration permit.
Source: Town of Milton, Pool Permits
How much is a pool permit?
The Town's building permit fee list shows a flat rate of $222 for a swimming pool enclosure permit, hot tubs included. The Town's pool permits page says applicable fees must be paid when you submit your application.
If you ask for a refund before the permit is issued, the by-law has the Chief Building Official keep 50 per cent of the fee; once the permit is issued there is no refund.
Source: Town of Milton, Building Permits
How long is a pool permit good for?
Six months from the date of issue, and it stays valid as long as the work is substantially completed before those six months run out. It can be renewed once for a further six months if you send a written request to the Chief Building Official before the first period expires. If the permit lapses, you must make a new application.
A permit transfers to a new owner only when that owner completes a permit application form and the Chief Building Official approves the transfer.
Source: Town of Milton, By-law No. 077-2010, Swimming Pool Fencing By-law (consolidated)
My subdivision is new. Does that change anything?
It can. If your subdivision has not yet been assumed by the Town, a pool permit will not be issued until you obtain a clearance letter from the developer agreeing to the work, including any change to the grade. To find out whether your subdivision has been assumed, the Town's pool permits page gives 905-878-7252 ext. 2398.
Source: Town of Milton, Pool Permits
When can I fill the pool?
Not until the enclosure has been installed as the by-law requires and has been inspected and approved by the Chief Building Official or a municipal law enforcement officer. Temporary fencing approved by the Town must stay up during construction. Book the inspection once the fence and gates are installed, the pool is ready but empty, and the equipment location is prepared; there is typically one final inspection.
If the permit was issued through the online portal, book the inspection there. Otherwise call 905-878-7252 ext. 2396.
Source: Town of Milton, Pool Enclosure Permit Application Guide (revised September 2026)