Skip to content

Tracker

New schools and additions

The new schools and major additions the Halton District School Board and the Halton Catholic District School Board have funded, are building or plan for Milton, each as the board's own pages and plans describe it.

Items
7
Dates ahead
1
Published, with a source

Read from MiltonIQ stories and their cited sources; the latest check was November 18, 2026.

See what each project is, the stage and opening date the board gives, and whether it has provincial funding, with the page that says so.

  1. Checked

    Milton #13 Public School (HDSB)

    A new elementary school at 1345 Trudeau Drive, at the southeast corner of Trudeau Drive and Whitlock Avenue. The board's construction page lists it at the construction stage (stage 7 of 9) with an anticipated opening of September 2028. The board's accommodation plan describes a 926-pupil-place school with a five-room child care centre.

    New schools and major additions in Milton, from the HDSB's and HCDSB's construction pages and long-term plans, as of November 18, 2026

    Reported in New schools planned in Milton: what is funded, what is being built and when each is due; HDSB's new Milton #13 elementary school on Trudeau Drive: 926 students, $43 million, opening fall 2028.

    Sources

  2. Checked

    Milton District High School renovation and addition (HDSB)

    Listed at the construction stage (stage 7 of 9) on the board's construction page. The board's accommodation plan says the school received funding for a major classroom addition and renovation, renewal work and a five-room child care centre, raising its capacity to 1,509 pupil places, with the addition opening in September 2028.

    New schools and major additions in Milton, from the HDSB's and HCDSB's construction pages and long-term plans, as of November 18, 2026

    Reported in New schools planned in Milton: what is funded, what is being built and when each is due.

    Sources

  3. Checked

    Milton #11 Catholic Elementary School (HCDSB)

    A three-storey school on Louis St. Laurent Avenue beside St. Kateri Tekakwitha Catholic Secondary School, with 763 elementary pupil spaces and a five-room child care centre. The Province announced funding on May 2, 2022. The board now says the school will open to students in September 2028; its November 2026 construction report shows load-bearing walls under way.

    New schools and major additions in Milton, from the HDSB's and HCDSB's construction pages and long-term plans, as of November 18, 2026

    Reported in New schools planned in Milton: what is funded, what is being built and when each is due; Milton's new Catholic elementary school on Louis St. Laurent Avenue is now due September 2028, and its new boundaries wait until then.

    Dates the stories state

    • · Milton #11 CES scheduled to open; approved boundary changes take effect

    Sources

  4. Checked

    Our Lady of Victory CES addition (HCDSB)

    An addition for 265 elementary pupils with a five-room child care centre, funded through the Province's 2024-25 Capital Priorities Program, which the board says was announced on January 27, 2025. The November 2026 construction report shows brick veneer removed and footing excavation under way. The board's 2026 capital plan lists the project against the 2027-28 school year.

    New schools and major additions in Milton, from the HDSB's and HCDSB's construction pages and long-term plans, as of November 18, 2026

    Reported in New schools planned in Milton: what is funded, what is being built and when each is due.

    Sources

  5. Checked

    Britannia #1 Catholic Secondary School (HCDSB)

    The Province approved $81.4 million for a new secondary school with 1,499 student spaces and 88 licensed child care spaces, announced in person on June 24, 2026. The board lists it with its current school construction projects and says construction reports will be posted once construction begins. Its project page gives no site address or opening date.

    New schools and major additions in Milton, from the HDSB's and HCDSB's construction pages and long-term plans, as of November 18, 2026

    Reported in New schools planned in Milton: what is funded, what is being built and when each is due; Province approves $81.4 million for a new Catholic high school in Milton.

    Sources

  6. Checked

    Trafalgar NE #1 Public School (HDSB, not funded)

    Planned, not funded. The board's accommodation plan says it is securing the lands for the school and will then submit a business case to the Ministry of Education for Capital Priorities funding, with a target window of 2028-29 to 2032-33. The plan says the board has told the Ministry the project may be part of its next funding submission.

    New schools and major additions in Milton, from the HDSB's and HCDSB's construction pages and long-term plans, as of November 18, 2026

    Reported in New schools planned in Milton: what is funded, what is being built and when each is due.

    Sources

  7. Checked

    Trafalgar #1 Catholic Elementary School (HCDSB, not funded)

    Planned, not funded. The board's 2026 Long-Term Capital Plan lists Trafalgar #1 CES as a capital project required for 2030-31, followed by Britannia elementary and Trafalgar and Britannia secondary schools (2031-32 or later), Trafalgar #2 CES (2034-35) and Agerton #1 CES (2038-39). The plan says timing depends on Ministry funding, Board approvals, site acquisition and municipal approvals.

    New schools and major additions in Milton, from the HDSB's and HCDSB's construction pages and long-term plans, as of November 18, 2026

    Reported in New schools planned in Milton: what is funded, what is being built and when each is due.

    Sources